Powered by OpenAIRE graph
Found an issue? Give us feedback

Alstom (Sweden)

Alstom (Sweden)

23 Projects, page 1 of 5
  • Funder: European Commission Project Code: 777599
    Overall Budget: 2,564,500 EURFunder Contribution: 1,795,150 EUR

    Coordination and demonstration embracing all areas of IP4 and targets aiming to assist support ensure and promote a common technical approach across the IP4 to allow integrated and coherent Technical Demonstrations as outlined on Shift2Rail master plan. Te objective will be achieved through different activities involving and promoting the collaborative participation of associated projects (for members of Shit2Rail and from open calls) and the partners involved, through the close technical interface with the different projects and the coordination of the integration activities activities to support and achieve consistency and convergence amongst the different projects, feeding a reliable set of technical packages.

    more_vert
  • Funder: European Commission Project Code: 101014935
    Funder Contribution: 8,583,800 EUR

    This proposal has been developed as the last phase of the work which will be developed within the Technical Demonstrators Traction (TD1.1) and HVAC (TD1.8) during the implementation of Shift2Rail. It takes place after PINTA2 and PIVOT-2. The ultimate goals of TD Traction and TD HVAC are, from one side to bring to the market a new generation of traction drive equipment and, on the other side, to develop Green house gases free HVAC. The proposal PINTA3 addresses the topic S2R-CFM-IP1-01-2020 Demonstrators for the next generation of traction systems including Silicon Carbide semi-conductor based Tractions systems demonstrations on trains, wheel-motor demonstration on High Speed Train, smart maintenance, virtual validation and eco-friendly Heating, Ventilation Air conditioning and Cooling (HVAC) and research on battery and hydrogen powered regional trains. This proposal has been developed to tackle the three main challenges related to Traction systems , HVAC and future decarbonised trains highlighted in the Call text: master technology breakthroughs, contributions to the implementation of new methodologies, tools, norms and standards, demonstrate environment friendly HVAC and improve the Shift2Rail Key Performance Indicators like Life Cycle Cost and reliability. PINTA3 will continue and extend the development of the work, mainly in terms of manufacturing and validation of the prototypes solutions on trains (up to TRL7), which has been initiated within PINTA2 and PIVOT-2. The same as PINTA2 high quality and experienced project coordination and management with defined roles will ensure the successful timely deliveries. This proposal addresses the topic S2R-CFM-IP1-01-2020 on Traction and HVAC.

    more_vert
  • Funder: European Commission Project Code: 730668
    Overall Budget: 12,823,200 EURFunder Contribution: 12,823,200 EUR

    The PINTA Project (IP1 Traction TD1 and Brakes TD5 – Phase 1) will address the two key topics highlighted in the first Shift2Rail Call topic S2R-CFM-IP1-01-2016 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management. Traction subproject will focus on the improvement of seven technical and economical performances of the Traction system that have been agreed and defined in Roll2Rail. These performances have to be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Operational reliability increase via higher reliability/availability. 3) Railway system LCC reduction As far as Adhesion management is concerned, the work will lead to the achievement of a number of important objectives linked to Brakes, such as · Improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities should contribute in formulating new performance specifications for Adhesion Recovery Systems. Moreover, improved requirements for Wheel Slide Protection test procedures should be developed, followed by new specifications for Automatic Test benches.

    more_vert
  • Funder: European Commission Project Code: 871319
    Overall Budget: 4,419,030 EURFunder Contribution: 4,419,030 EUR

    The ADEPTNESS project seeks to implement and investigate a streamlined and automatic workflow that makes methods and tools to be seamlessly used during design phases as well as in operation. We will explore the generation and reuse of test cases and oracles from initial phases of the development, to the system in operation and back to the laboratory for reproduction. Integrated in this workflow, unforeseen situations will also be detected in operation to enhance development models for increasing resilience. We will consider several aspects of uncertainties (such as uncertainties in environment, uncertainty produced due to timing aspects of CPSoS, uncertainty in networks, etc.). Additionally, automatic and synchronized deployment techniques will be investigated to improve the agility of the whole workflow that covers the design-operation continuum.

    more_vert
  • Funder: European Commission Project Code: 826054
    Funder Contribution: 12,680,600 EUR

    The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management. PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems. On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion. The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22.

    more_vert
  • chevron_left
  • 1
  • 2
  • 3
  • 4
  • 5
  • chevron_right

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.