Powered by OpenAIRE graph
Found an issue? Give us feedback

REN - REDE ELECTRICA NACIONAL S.A.

Country: Portugal

REN - REDE ELECTRICA NACIONAL S.A.

12 Projects, page 1 of 3
  • Funder: European Commission Project Code: 774500
    Overall Budget: 4,175,450 EURFunder Contribution: 4,175,450 EUR

    This project aims to design and develop novel Information and Communication Technology (ICT) tools and techniques that facilitate scalable and secure information systems and data exchange between Transmission System Operator (TSO) and Distribution System Operator (DSO). The three novel aspects of ICT tools and techniques to be developed in the project are: scalability – ability to deal with new users and increasingly larger volumes of information and data; security – protection against external threats and attacks; and interoperability –information exchange and communications based on existing and emerging international smart grid ICT standards. The project focuses on TSO-DSO interoperability. While TSO-TSO interoperability is currently well established by ENTSO-E through implementation of the Common Grid Model Exchange System, TSO-DSO interoperability will also benefit future TSO-TSO interoperability. In this context the project will also consider DSO to other Market-participants (DSOs, Aggregators, Distributed Energy Resource Operators, Micro-grid Operators) and information or data access portals that enable business processes involving relevant actors in the electrical power sector. Beyond state-of-the-art progress that will be achieved: Fully defined interface specifications for TSO-DSO information exchange interfaces based on Use Case analysis and IEC 61970/61968/62325 standards to support highly automated information exchange and network analysis. Fully defined interface specifications for information exchange between DSOs and market participants based on Use Case analysis and IEC 61850 and IEC 62325 standards to support highly automated information exchanges. Role-based access control that securely accommodates new data requirements and unbundling processes. A specified suite of ICT protocols and integration with the defined interfaces. Proof of Concept using field tests and demonstration with industry specification at both TSO and DSO levels.

    more_vert
  • Funder: European Commission Project Code: 863819
    Overall Budget: 4,449,770 EURFunder Contribution: 4,449,770 EUR

    The current high-speed deployment rate of non-programmable Renewable Energy Sources (RES) is making transmission network planning activities more and more complex and affected by a high level of uncertainty. Because network investments are capital intensive and the lifetime of the infrastructure spans several decades, it may happen that when a new line is commissioned it is no longer the best option and it might be partially regarded as a stranded cost. There is an on-going debate on the selection of the more effective technologies that could contribute to system flexibility. This category doesn’t only include grid technologies, but also storage elements and flexible demand, both located in transmission or provided by opportunely aggregated distributed energy sources located in distribution networks. FlexPlanning aims at creating a new tool for optimizing transmission and distribution grid planning, considering the placement of flexibility elements as an alternative to traditional grid planning. This approach aims at helping to reduce overall power system costs i.e. infrastructure deployment and operation costs, the latter in terms of procurement of energy and system services. FlexPlan is going to take into account environmental impact and footprint (impact on air quality for thermal generation, carbon footprint, impact on landscape of new T&D lines). A pre-processing tool is also created to determine location, size and associated costs for storage and flexible demand candidates. The new planning tool is first validated and then used for analysing six detailed regional scenarios at 2030-2040-2050 in order to assess the potential role of storage and flexible resources. Pan-European scenarios are preliminarily elaborated in order to provide border conditions for the regional cases. Regulatory conclusions are drawn to analyse whether opportune incentivisation procedures could be put in place by the regulators wherever some consistent advantages are demonstrated.

    more_vert
  • Funder: European Commission Project Code: 241399
    more_vert
  • Funder: European Commission Project Code: 283012
    more_vert
  • Funder: European Commission Project Code: 211407
    more_vert
  • chevron_left
  • 1
  • 2
  • 3
  • chevron_right

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.